Advantages
Â
It takes less than a minute to install; no possession time is needed.
restores up to 90% of the screw torque and pull-out strength from the original
enhances gauge retention and track construction
postpones replacing the mattresses
No need to remove the current base plate during installing; not impacted by environmental or climatic factors
Reusing already-existing screw spikes and fasteners
Â
Fact sheet
Â
More than 50 million units are in use globally.
Extensive testing conducted by Deutsche Bahn and SNCF has definitively demonstrated that they are the most cost-effective, long-term solution to worn sleeper holes.
Railway Aluminum Insert package can be carton box with pallet, also can be wooden cases or as customer's request. 50pcs per plastic bag, 250pcs/box, 8000pcs/cases, 11250pcs/pallet.
Â
http://www.railwayfastening.com/